include ("header.html"); ?>
|
PORCH
DECK CONSTRUCTION:
It is best to build decks at the same
time the subfloor is built. The
decks will provide walk-around areas during the log wall construction.
Always use C.C.A.-treated wood or the equivalent (cedar, redwood,
etc.) when constructing exterior decks, even if they will have roofs
covering them.
If a wider sill plate was used under the
subfloor where porch decks join, (as previously discussed) you will have a
2” ledge for your deck joists to rest on. If not, we recommend the use of 2x8 joist hangers.
Use 2x8 porch floor joists, keeping their bottom edge flush with
the top of the subfloor sill plate. This
will keep the top of the deck floor 1” to 2” lower than the house
subfloor. A lower deck floor
prevents blowing rain and water from seeping under your log walls. |